When we receive a
new
mold test mould proofing needs, we are always keen to try out an earlier
result of prayer request and smooth so as not to waste hours of work and cause
trouble.
But in this we have to remind two points: first, the
mold designers and manufacturing engineers sometimes an error in our test model,
fails to alert small error may arise due to large damage. Second, the test model
results is to ensure the successful future production. If the tryout process did
not follow reasonable steps and make the appropriate records, that is no way to
guarantee the smooth progress of mass production. We also emphasize that “the
use of smooth, then mold will quickly increase the profits of the recovery,
otherwise the cost of damage caused by even more than the mold itself will
cost.”
Second, try this before you die
1. Relevant information about mold:
Can achieve the best mould design drawings, detailed to
the analysis, and some have mold test mold technician to participate in the
work.
2. The first stage in the work of the mechanical
inspection with the action:
Should pay attention to whether the cuts, missing pieces
and loose phenomena, mode to the slide action is really, waterway and airway
joints with or without leakage, mold opening process, then if restrictions
should also be marked in the model. If these actions before the model was done
in the hanging, that would be found to avoid problems linked to mold, mold
removal go to waste hours of work have taken place.
3. When the proper action after determining mould
ministries, we must select the appropriate test mold injection molding machine,
the choice should pay attention to
(A) Injection capacity
(B) the width of guide bar
(C) the largest open range
(D) are complete and other accessories. All
confirmed that no problems were hanging next step is to mold, hanging in the
lock should pay attention to all the templates folder and mold do not remove the
fish before the hanging, in order to avoid loosening or breakage of the template
folder so that die fall.
Mold should be carefully re-installed after inspection mold all the parts
of mechanical movement, such as skateboarding, thimble, back tooth structure and
limit switches of action really. And pay attention to Shoot mouth is aligned
with the inlet. The next step is to pay attention to clamping action, then the
pressure should be lowered off mode, in manual and low clamping action in
attention and listen to see whether there is any different from time to smooth
movement and sound and so on.
4. Raise the mold temperature:
Based on raw materials used in product
performance and die size of the choice of appropriate mold temperature control
unit will die when the temperature increased to produce the required
temperature. Once the mold temperature increased again after the view to the
various parts of the action, because the steel due to thermal expansion, may
lead to card mode phenomenon, it should be noted that the sliding ministries in
order to avoid strain and vibration generation.
5. If the pilot scheme is not implemented within the
factory rules, we propose to adjust the conditions of a test mode a condition
can only be adjusted in order to distinguish one effect of changes in the terms
of the finished product.
6. According to different raw materials, on the
appropriate use of the original Tu-made baking.
7. Tryout with the future production using the same raw
materials as possible.
8. Do not totally inferior race tryout material, if the
color needs to be arranged test color.
9. Internal stress and other issues often affect the
secondary processing, should be finished after the tryout to be stable after
secondary processing of slow closed mold, the mold should be fine off the
pressure and movement several times to see whether the co- mold pressure
inequality and to avoid distortion product generated flash and mold.
After checking the above steps are then die off die off
speed and the pressure reduced, and the security buckle ejection rod and set a
good trip, and then transferred to a normal off mode and off mode speed. If the
trip involves the maximum limit switch should be adjusted to shorter mold
stroke, in which cut off the mold before the maximum travel speed mold action.
This is because the put on the mold during the trip among the high-speed
movements who travel longer than the low speed of it. Mechanical machine in the
plastic top of the bar must also be adjusted after the full opening-mode action
role, so that thimble board or peel board Stress and deformation.
In the first model for injection before you re-check the
following:
(A) whether the feeding schedule is too
long or less.
(B) the pressure is too high or too
low.
(C) whether the filling too fast or too
slow speed.
(D) processing cycle is too long or too
short.
To prevent the finished short shot, broken, deformed, or
even hurt mold flash. If the processing cycle is too short to wear a thimble to
the top ring Jishang finished products or peeling. Such circumstances may cause
you to spend 23 hours to remove the finished product. If the processing cycle is
too long, then the mold core of the thin rubber parts may tighten and broken, of
course, you can not expect tryout process might happen, but do take account of
prior and timely measures will help you avoid serious and costly
damage.
Third, the main steps tryout
In order to avoid unnecessary waste of production time
and when disturbed, indeed, necessary to pay the patience to adjust and control
various processing conditions, and find the best temperature and pressure
conditions, and develop standard procedures for test mode and available and in
establish a regular working methods.
1. View the barrel of the plastic material is correct,
and whether in accordance with the provisions of baking, (test mode and
production of different raw materials if it might yield different
results).
2. Feed tube to ensure thorough cleaning to prevent bad
solution, or miscellaneous material rubber injection mold, plastic materials and
hybrid solution because of inferior materials may be mold stuck. Test tube
temperature and mold temperature of raw materials for processing.
3. To adjust pressure and injection volume in order to
produce a satisfactory finished appearance, but can not run flash in particular,
there are some not yet fully solidified cavity when finished, before the
adjustment of various controlled conditions should think about, because the
filling rate slightly changes may lead to changes in very large
filling.
4. To be patient until the conditions of machines and
molds to stabilize, that is, medium-sized machines may have to wait more than 30
minutes. Can use this time to see the finished product problems that might
arise.
5. Screw forward time can not be shorter than the
plastic gate solidification time, otherwise the product will reduce the loss of
weight and performance of finished products. And when the mold is heated screw
forward time for compaction should also be extended discretion of finished
products.
6. Reasonable adjustments to reduce the overall
processing cycle.
7. Redeployment of the conditions of the new operation
at least 30 minutes, stabilize, and then continuous production of at least a
dozen products all look in their bowl marked date, number, and press cavity were
placed in order to test the stability of the exact operation and export the
reasonable control of tolerance. (Particularly valuable for multi-point
die).
8. Will continuously measure and record the significant
sample size (such samples should be cooled to room temperature and then
volume).
9. The amount of each product may look like the size to
make a comparison, should be noted:
(A) the stability of size.
(B) whether there are certain size has
increased or decreased while still showing a change in processing conditions,
such as poor temperature control or hydraulic control.
(C) whether movements in size within the
tolerance range.
10. If not quite finished size of changes in processing
conditions are normal, you need to see if each cavity of the finished product
its quality can be accepted, its size can be within the tolerance allowed. To
measure out more or less continuous average cavity number down to check whether
the correct size of the mold.
Record and analyze data in order to modify
the tooling and production as conditions require, and for the future reference
for mass production.
1. To make a longer processing time of operation to
stabilize the melt temperature and hydraulic oil temperature.
2. By all the finished size is too large or too small
to adjust the machine conditions, if the shrinkage appears to shoot too much and
finished less than expected, also available for reference in order to increase
the gate size.
3. The cavity size is too large or too small to be
amended, if the cavity size and the door is still correct, then the candidate to
change the machine conditions, such as filling rate, mold temperature and
pressure, ministries, and view some of the mold Point is filling
slowly.
4. In accordance with the finished product of the
cavity mold core shift with circumstances or be modified individually, perhaps
try transfer mold filling rate and temperature, in order to improve its
uniformity
5. Check and modify the injection machine malfunction,
such as pumps, oil valves, temperature controllers, etc. will lead to adverse
changes in processing conditions, even more perfection in the maintenance of the
mold can not be bad to play a highly efficient machine. In reviewing the records
of all values, the retention of a sample compared to proofread the sample after
it has been amended to improve.
Fourth, important issues
Keep all samples in the tryout process inspection
records, including the processing cycle, all kinds of pressure, melt and mold
temperature, tube temperature, injection movement time, screw feeding time,
etc., in short, should help to save all future was able to successfully create
the same conditions of data processing in order to obtain the products meet
quality standards.
The plant is often overlooked when testing mold mold
temperature, and in the short-term production test mode and in the future when
the mold temperature is the most difficult to master, rather than the correct
sample of the mold temperature can affect the size, brightness, shrinkage, flow
lines, and less material phenomena If no mold temperature controller to hold in
the future when production problems occur.
This entry was posted in
Mould Technology Blog and tagged
china injection mold manufacturer,
China Injection
Mould,
china mold supplier,
China Mould
maker,
plastic injection molding,
plastic mould
china. Bookmark the
permalink.